What you build storage for
A battery storage system looks different depending on its job. Size, power, connection and revenues all change. These are the four most common cases.
Commerce and industry
- Consumption
- Solar power
- Grid supply with storage
- Storage charges
- Storage supplies
- Connection capacity
Schematic
Use more of your own power, shave load peaks.
Your business draws power in peaks, and at midday your solar system produces more than you need. A storage system evens out both. It shaves the load peak, shifts solar power into the evening and, for fast charging, supplies the power the grid connection would otherwise have to grow for.
- Lower the capacity charge
- Use your own solar power
- Fast charging without grid expansion
- Backup power with switchover in milliseconds
Grid services and trading
- Electricity price over one day
- Storage charges
- Storage supplies
Schematic
Provide balancing power, use price differences.
The storage charges when power is cheap and supplies when it is scarce. It also holds power in reserve for the transmission grid. What matters is a strong connection point, a clean metering concept and a marketing set-up that serves several markets.
- Provide balancing power
- Trade on spot and intraday markets
- Combine several revenue streams
- Settle the metering concept with the grid operator early
Investors and partners
- Land securedOption or building right
- Grid commitmentConnection capacity confirmed
- PermitBuilding permit granted
- AwardPrices and dates fixed
- AcceptancePark is on the grid
- OperationYield and reports
Schematic
Develop projects on a basis you can check.
You are looking for projects with a clear basis, or you own land and need someone to develop it. We bring site, grid commitment, permits and revenue calculation into a form that can be audited. Plots of around one hectare or more close to a substation are of particular interest.
- Projects in clearly separated phases
- Assumptions open and traceable
- Site checks and development
- Work with installers and planners
Grid operators
Schematic
Ease bottlenecks, hold the voltage.
Storage at the right node takes peaks out of lines and transformers, supports the voltage and can defer an upgrade. We plan to your connection requirements and deliver the documents the way your application process asks for them.
- Ease bottlenecks in the feeder
- Support voltage and reactive power
- Inverters to EN 50549, depending on the version
- Documents that match your connection request
Your case is not listed?
Most projects combine two of these jobs. Describe what you have in mind and we will tell you what fits, technically and commercially.