Gridenity

Your storage park takes shape here.

Gridenity develops, supplies and builds battery storage from 220 kWh to more than 50 MWh. We stay with you from the site through grid connection, permits and financing to operation.

30 MWh
Size
30 MWh
Power
15 MW
Units
6 battery containers, 6 conversion stations

Example parcel, schematic. The real layout follows your site.

From a single cabinet to a park

  • CabinetsCommerce and industry, expandable to 2.1 MWh
  • Containers1 to 5 MWh per unit, 20 ft
  • ParkContainers and conversion stations in rows

A storage park is an installation on the power grid. It needs a suitable site, a connection request to the grid operator, a building permit, fire safety, a noise assessment and an operation that pays its way. Gridenity runs all of this as one project, from the first site check to handover and beyond.

What a storage system does all day

06121824 h
  • Consumption
  • Solar power
  • Grid supply with storage
  • Storage charges
  • Storage supplies
  • Connection capacity

Schematic of a working day at a business with a solar system. Not measured data.

  1. Shave load peaks

    The storage supplies as soon as your demand reaches its peak. The capacity charge falls and the grid connection does not have to grow.

  2. Shift solar power

    The midday surplus is available in the evening instead of flowing into the grid for little money.

  3. Trade on the market

    Charge when prices are low, supply when they are high. Balancing power for the transmission grid comes on top.

  4. Relieve the grid

    Storage at the right node takes peaks out of lines and transformers.

Six phases, one project

We work in the phases of the Swiss SIA 112 standard. You always know where your project stands and what will be decided next.

  1. Phase 1: Strategic planningDefine the need, check the site, run a first business case.
  2. Phase 2: Preliminary studiesProve feasibility, ask the grid operator, pre-check setbacks, noise and fire safety.
  3. Phase 3: Project designFix the layout, work out the building project, obtain permits, settle the financing.
  4. Phase 4: TenderingObtain and compare offers, award contracts, fix the dates.
  5. Phase 5: ConstructionBuild the foundations, deliver and install the units, commission the park.
  6. Phase 6: OperationOperate, monitor, maintain and market the energy.

The building blocks, drawn to one scale

Every park is made of a few standard units. Here they stand side by side, as large as they really are next to each other.

  • Cabinet

    218 to 265 kWh, 125 to 250 kW

    1.0 × 1.2 × 2.4 m

  • Cabinet row

    1 MWh, 500 kW

    4 cabinets, 4.0 m wide

  • Mobile storage

    220 kWh to 2.1 MWh, shown at 1 MWh

    10 ft, 3.0 × 2.4 × 2.6 m

  • Battery container

    1 to 5 MWh

    20 ft, 6.1 × 2.4 × 2.9 m

  • Conversion station

    2.5 MW, with transformer

    20 ft, 6.1 × 2.4 × 2.6 m

  • Charging station

    40 to 800 kW

    0.7 × 0.8 × 2.05 m

Tell us the site. We take it from there.

Give us the location and the size you have in mind. We check grid, zoning and setbacks and come back with a first assessment. The preliminary check is free of charge.